- Discussed the Project Purpose and Need
- Improve safety along the route
- Improve the geometric characteristics of the route
- Provide improved Level of Service for all vehicle types
- Preserve the historic and pastoral nature of the region by minimizing
impacts from the roadway footprint on these features.
|
|
6
|
- Discusses Possible Roadway Typical Sections
- Looked at the Level of Service for a 2-lane and
- 4-lane route.
- 2-lane level of service is “D”
- 4-lane level of service is “B”
|
|
7
|
- Divided into Subcommittees and developed a final list of criteria.
- Separated out design issues from weighting criteria.
- Design issues will be included in the minutes and carried through to the
next phases of the project.
|
|
8
|
- DESIGN ISSUES IDENTIFIED:
- 1. Provide ample signage for
tourism sites
- 2. Provide roadway aesthetics,
particularly
- as a gateway to Bardstown
- 3. Minimize the use of
aboveground utilities
- 4. Maximize the use of landscaping along project route
|
|
9
|
- Mailed out 779 surveys – primarily to residents of the corridor.
- Received 191 responses.
- The responses provided the weights for the criteria list used to look at
the alignments.
|
|
10
|
- Discuss peer review weights and comments
- Prepare final list of criteria with weights
- Review scores for study alignments and proposed alignments
- Provide comments on alignments
|
|
11
|
- Discuss peer review weights and comments
- Eliminate criteria that have “insignificant” weights
- Eliminate criteria that are better served by another group
- Prepare final list of criteria with weights
|
|
12
|
- Review study alignments and proposed new alignments
- Review scores from various combinations of the alignments
- Provide comments on the alignments and any modifications you’d like to
see
|
|
13
|
- Review format of public meeting
- Review and comment on displays
- Review alignments
|
|
14
|
- Make alignment modifications
- Prepare a revised scoring list based on new weights
- Get materials ready for CAG meeting 4
- Advertise for the public meeting
|
|
15
|
- 4th CAG Meeting – April 21, 2003
- PUBLIC MEETING – May 8, 2003
|
|
16
|
|
|
17
|
|
|
18
|
- Gary Valentine, P.E.
- District Pre-Construction Engineer
- Kentucky Department of Highways District 4
- 634 East Dixie
- P.O. Box 309
- Elizabethtown, Kentucky 47202-0309
- Phone: 270-766-5066
- Fax: 270-766-5069
- E-mail: gary.valentine@mail.state.ky.us
|
|
19
|
- Jeff Schaefer
- District Environmental Coordinator
- Kentucky Department of Highways District 4
- 634 East Dixie
- P.O. Box 309
- Elizabethtown, Kentucky 47202-0309
- Phone: 270-766-5066
- Fax: 270-766-5069
- E-mail: jeff.schaefer@mail.state.ky.us
|
|
20
|
- Richard Sutherland, P.E.
- US 31E Project Manager
- American Consulting Engineers, PLC
- 400 E. Vine Street, Suite 100
- Lexington, Kentucky 40507
- Phone: 859-233-2100
- Fax: 850-254-9664
- E-mail: Sutherland@ace-plc.com
|
|
21
|
|