1
WELCOME
2
 
3
 
4
 
5
REVIEW OF 2ND CITIZENS ADVISORY GROUP MEETING
  • Discussed the Project Purpose and Need
    • Improve safety along the route
    • Improve the geometric characteristics of the route
    • Provide improved Level of Service for all vehicle types
    • Preserve the historic and pastoral nature of the region by minimizing impacts from the roadway footprint on these features.
6
REVIEW OF 2ND CITIZENS ADVISORY GROUP MEETING
  • Discusses Possible Roadway Typical Sections
    • Looked at the Level of Service for a 2-lane and
    •    4-lane route.
    • 2-lane level of service is “D”
    • 4-lane level of service is “B”
7
REVIEW OF 2ND CITIZENS ADVISORY GROUP MEETING
  • Divided into Subcommittees and developed a final list of criteria.
  • Separated out design issues from weighting criteria.
  • Design issues will be included in the minutes and carried through to the next phases of the project.
8
REVIEW OF 2ND CITIZENS ADVISORY GROUP MEETING
  • DESIGN ISSUES IDENTIFIED:
  • 1.  Provide ample signage for tourism sites
  • 2.  Provide roadway aesthetics, particularly
  • as  a gateway to Bardstown
  • 3.  Minimize the use of aboveground utilities
  • 4. Maximize the use of landscaping along project route
9
RESULTS OF 2nd SURVEY
  • Mailed out 779 surveys – primarily to residents of the corridor.
  • Received 191 responses.
  • The responses provided the weights for the criteria list used to look at the alignments.
10
TONIGHTS MEETING
  • Discuss peer review weights and comments
  • Prepare final list of criteria with weights
  • Review scores for study alignments and proposed alignments
  • Provide comments on alignments
11
SUBCOMMITTEE EXERCISE 1
  • Discuss peer review weights and comments
  • Eliminate criteria that have “insignificant” weights
  • Eliminate criteria that are better served by another group
  • Prepare final list of criteria with weights


12
SUBCOMMITTEE EXERCISE 2
  • Review study alignments and proposed new alignments
  • Review scores from various combinations of the alignments
  • Provide comments on the alignments and any modifications you’d like to see
13
NEXT MEETING
  • Review format of public meeting
  • Review and comment on displays
  • Review alignments
14
NEXT STEPS
  • Make alignment modifications
  • Prepare a revised scoring list based on new weights
  • Get materials ready for CAG meeting 4
  • Advertise for the public meeting
15
SCHEDULE OF UPCOMING MEETINGS
  • 4th CAG Meeting – April 21, 2003


  • PUBLIC MEETING – May 8, 2003
16
 
17
HANDOUTS AND QUESTIONS
18
US 31E CONTACT INFORMATION
  • Gary Valentine, P.E.
  • District Pre-Construction Engineer
  • Kentucky Department of Highways District 4
  • 634 East Dixie
  • P.O. Box 309
  • Elizabethtown, Kentucky 47202-0309
  • Phone: 270-766-5066
  • Fax: 270-766-5069
  • E-mail: gary.valentine@mail.state.ky.us
19
US 31E CONTACT INFORMATION
  • Jeff Schaefer
  • District Environmental Coordinator
  • Kentucky Department of Highways District 4
  • 634 East Dixie
  • P.O. Box 309
  • Elizabethtown, Kentucky 47202-0309
  • Phone: 270-766-5066
  • Fax: 270-766-5069
  • E-mail: jeff.schaefer@mail.state.ky.us
20
US 31E CONTACT INFORMATION
  • Richard Sutherland, P.E.
  • US 31E Project Manager
  • American Consulting Engineers, PLC
  • 400 E. Vine Street, Suite 100
  • Lexington, Kentucky 40507
  • Phone: 859-233-2100
  • Fax: 850-254-9664
  • E-mail: Sutherland@ace-plc.com
21
THANKS AGAIN FOR